As I always say, the house is coming along slowly. The only difference now is that the building contract expires in two weeks today. Easter is rapidly approaching and we just want our own home. There isn't much to go. Painting and tiling are done, as far as we can see, which only leaves flooring, electricals, concreting and appliances. We are yet to be given any indication about how long this will take.
Overall we are happy with how the house is looking.


This is the dusty laundry, but it's looking pretty good.

This is the view down the hall from the front door. Again, we're happy with this.

What we're not so happy with is workmanship in some areas. It was clear the day the ceiling of the garage went in that something wasn't right. It rained that afternoon and water was pouring through the gaps in the plaster board. We were told it would be alright, but by the end of the second lot of torrential rain for the month, it was clear that is wasn't. Apparently, the whole lot will have to be ripped out, tiling of the roof 'finished' properly, then the plaster will be redone.

I can't remember if I have already put this photo up, but this was a little Christmas present from someone. In the week between Christmas and New Year's Eve, a brick was thrown at the window. It was obviously not thrown with great force because it didn't break the second pane of glass but it is still very annoying.

No comments: